Address Sky View twin-tower development in Downtown Dubai
Completed Project · High-Rise · Downtown Dubai

Address Sky View

A 61-floor twin-tower hotel, residence and serviced apartment complex in the heart of Downtown Dubai. Agile Prime delivered the full formwork and steel fixing package, supporting the main contractor on a technically demanding high-rise development.

Client

EMAAR

Location

Downtown Dubai · UAE

Scope

Formwork & Steel Fixing

Status

Completed

Project Overview

Address Sky View is a striking 61-floor twin-tower complex combining hotel, branded residences and serviced apartments over a shared podium. Located in Downtown Dubai, the development forms part of EMAAR’s flagship hospitality and lifestyle portfolio overlooking Burj Khalifa and the Dubai skyline.

Agile Prime’s teams were engaged by the main contractor, ACC, to execute the full formwork and steel fixing package. This included tower cores, typical floor slabs, podium levels and key structural elements that support the elevated amenities and connectivity between both towers.

Our engineer-led supervision ensured safe sequencing of works on a constrained city-center site, with careful planning around crane usage, material deliveries and simultaneous activities by façade and MEP contractors. The result was a controlled structural programme aligned with the overall project milestones for EMAAR.

Visual Highlights

Selected views of the towers and structural works.

Scope of Works

  • • Formwork & steel fixing for tower cores and typical floor slabs.
  • • Structural works to podium levels, amenities floors and parking decks.
  • • Shear walls, columns, transfer structures and link elements between towers.
  • • Staircases, parapets and secondary structural items coordinated with MEP.
  • • Close interface management with façade and MEP trades in a tight urban site.

Delivery Highlights

  • • Supported ACC in delivering a complex high-rise structure within EMAAR’s programme.
  • • Sequenced high-rise pours to maintain safe access and crane utilisation in Downtown Dubai.
  • • Unified in-house workforce enabled stable productivity across both towers and podium.
  • • Daily engineering coordination reduced rework and supported on-time slab cycles.