Skyblade by Binghatti
Ongoing Project · High-Rise · Dubai

Skyblade by Binghatti

A bold architectural tower designed for residents who lead, inspire, and live differently. Agile Prime delivers the core structural works that support Skyblade’s dramatic form and refined interiors.

Client

Binghatti

Location

Dubai · UAE

Scope

Formwork & Steel Fixing

Status

Ongoing

Project Overview

Skyblade is conceived as a striking residential tower that stands out on the Dubai skyline. The architecture is tailored for modern visionaries — residents who value thoughtful design, comfort, and a lifestyle that feels elevated beyond the ordinary.

Within this design vision, Agile Prime’s role focuses on delivering a precise and robust structural frame. Our teams execute the full formwork and steel fixing package, ensuring that the tower’s sharp geometry and dynamic façades are supported by accurate, high-quality concrete works and reinforcement detailing.

Working in close coordination with Binghatti, the main contractor Granada Europe Construction, and specialist trades, we sequence structural activities to align with façade, MEP, and finishing works. This integrated approach maintains programme discipline while protecting the architectural intent that makes Skyblade a landmark address.

Visual Highlights

Selected views illustrating Skyblade’s form and construction progress.

Scope of Works

  • • Full formwork and steel fixing package for tower structural elements.
  • • Cores, columns, walls, slabs and transfer elements aligned with architectural geometry.
  • • Coordination of embedded items, block-outs and openings with MEP and façade requirements.
  • • Structural works to podium and access zones as per main contractor sequencing.
  • • Quality-controlled concrete pours with strict checks on levels, cover and finishes.

Delivery Highlights

  • • Engineer-led supervision ensuring structural accuracy for Skyblade’s bold architecture.
  • • In-house teams enable rapid response to design clarifications and programme changes.
  • • Integrated planning with Granada Europe Construction and Binghatti project teams.
  • • Focus on safe access, edge protection and lifting plans throughout vertical construction.
  • • Structural works executed to support a calm, high-end residential experience for end users.